Power Infrastructure for AI & Hyperscale Data Centers
MW-scale generators, switchgear, and mission-critical backup power solutions for utility-constrained AI deployments.
5–500 MW
Modular capacity
12–24 mo
Typical deployment
Multi-fuel
Gas · Diesel · Hybrid
Check Capacity Availability
Built for Mission-Critical Infrastructure
Trusted Infrastructure Ecosystem
Supporting equipment procurement across leading industrial OEM ecosystems.
The grid can't keep up with AI compute demand.
Utility interconnect queues are now 5–7+ years in many markets. Behind-the-meter power is the only path to compute online in 12–24 months.
Bypass interconnect delays
Stand up megawatt-scale generation independent of utility timelines.
Built for high-density compute
Modules sized and configured for AI training and inference workloads.
Specialist diligence
We pre-qualify availability, condition, fuel logistics, and emissions profile.
Commissioning support
Coordinate transport, install, EPC handoff, and ongoing service.
Right-sized capacity
Single units or multi-module configurations from 5 MW to 500+ MW.
Multi-fuel flexibility
Natural gas, diesel, dual-fuel, and hybrid configurations available.
Currently Available Power Modules
A curated selection of power generation units ready for AI data center deployment.

Parker 10 MW Interconnection & Power Conversion Platform

Siemens SGT-A05

1986 Siemens Westinghouse W501

2014 Cummins NHC20-QSK60G22

Siemens SGT-A05

Solar Turbines Taurus 60

2021 Siemens SGT-300 DLE

2026 Kohler 3MW

2012 Siemens SGT5-2000E

2014 Siemens STG6-5000

2014 GE GE Frame 9 HA

Solar 70

Solar Turbines Solar Taurus 60

2014 Siemens SGT5-2000E CCP Power Plant

2021 Cummins QSK78-G11

2025 Mitsubishi FT8

2002 GE LM6000 PC Sprint SAC Units

2025 Rolls-Royce Power Systems MTU - DS2250

GE 6B Frame

GE TM2500

Solar Turbines 60 Taurus

2025 Cummins C2000D6E Diesel Genset

Caterpillar 3516E

2002 GE Sprint and DLE

2014 GE GE Frame 5PA-DLE (2014)

Caterpillar 3516B

Caterpillar G3520

Solar Turbines Centaur 40

Cummins C2000D6E

Solar Turbines Solar Taurus 60

GE LM2500

Pratt & Whitney FT4C-1D

2018 GE TM 2500

Pratt & Whitney FT-4C3F

1995 GE Frame 6B

2022 WEG M0190060-01

2022 WEG M0190060-01
Power assets transact institutional-grade.
Owners of gas turbines, containerized gensets, and balance-of-plant equipment only engage with qualified buyers. Have these three items ready and we'll move quickly.
Letter of Intent (LOI)
A signed LOI on company letterhead identifying the unit(s), buyer entity, and intended deployment site.
Proof of Funds (POF)
Bank comfort letter, MT799, or equivalent statement showing available capital for the full transaction value.
10–30% Deposit
Refundable escrow deposit released against inspection and milestone-based payment terms in the SPA.
No LOI/POF yet? That's fine — still reach out. We'll help you scope the project, share templates, and introduce financing partners so you're deal-ready before owners are engaged.
Power Infrastructure for AI & Hyperscale Data Centers
MW-scale generators, switchgear, and mission-critical backup power solutions for utility-constrained AI deployments.
Prefer to call? (855) 454-3434